The Hiking Clubs’ Annual Trail Maintenance Day was Saturday March 26th from 8:30 a.m. to 1 p.m. With lunch provided afterward.
Listed below are some of the areas identified for trail improvement that were worked.
- Top of Meadow from 45 to 46. Need to level out dirt from erosion.
- Meadow from 46 to 47 . Same thing.
- Upper Meadow from 48 to 39 where pigs have obliterated the trail (unless maintenance has already fixed.)
- New picnic table location near location 50. Needs leveled from pig damage and path created to the table.
- Switchbacks starting at the top of the hill.
- Bay trail through woods from 37 to 46. (Russ has already volunteered to lead this one.)
Villages Maintenance Services provided “mule rides” to the work sites. Tools were provided.